Quantcast
Channel: Wangjianshuo's Blog » Line #7
Viewing all articles
Browse latest Browse all 2

Metro Line 7 and 9 Became Full Time

$
0
0

After I am back to Shanghai, the Metro Line #7 became operating in full time – from 5:30 to 22:31. Before, it only operate between 9:00 – 16:00. That means, Metro Line #7 started to operate in real sense. At the same time, Metro Line #9 started similar full time operation. Both intervals are 6 minutes.

Look at this map I shot in a metro station – that is the current metro map.

Photograph by Jian Shuo Wang

On this map, there are many small modifications – the staff used sticker to mark out some stations that are not open yet. Since the stations and even metro lines are going to open in the next few weeks, they didn’t bother to create a new chart. Those segments include the east extension of Metro Line #2 to Pudong Airport, and west extension to the new Hongqiao Airport Terminal 2.

When the metro system started to form a network, the feeling of a metro ride is very different from the time when there are just one line or two. You will encounter an interchange station for every two or three stations. People get off the train and get on the train much more frequently than before – you are not sure whether they get off the train because it is their destination or just transit to another metro line. The capacity of the metro system is also expanded – the bottlenecks are no longer bottlenecks, because of so many “load balance lines” there.

I am very excited to see the change, and enjoy navigating the city by going under it.


Viewing all articles
Browse latest Browse all 2

Latest Images

Trending Articles





Latest Images